Schedule an Inspection

Scheduling Inspections

All Inspection requests must be received by 3:00 p.m. on the business day prior to the requested inspection. Timed inspections for concrete pours and utility service changes can be scheduled between 8:30 a.m. and 4 p.m. This is only an inspection request; once scheduled, a confirmation of your inspection will be emailed to you. 

To schedule an inspection, please use the scheduling form.

REQUIRED INSPECTIONS

  • Braced Wall Panel (Shear Wall)
  • Drywall (Sheetrock, Gypsum Wallboard)
  • Electrical 
  • Final (Project Final Inspection)
  • Final Electrical
  • Final Energy
  • Final Grading
  • Final Mechanical
  • Final Plumbing
  • Fire-Rated Walls
  • Footing
  • Foundation 
  • Four-Way (Framing, Rough Electrical, Rough Plumbing, & Rough Mechanical)
  • Framing
  • Gas Line Test (Clearance)
  • House-Wrap


  • Insulation
  • Landscaping
  • Masonry Walls
  • Mechanical (HVAC)
  • Plumbing
  • Post Tension
  • Power to Panel 
  • Pre-cast Concrete Slab
  • Re-roof
  • Shower Pans
  • Solar Panels
  • Stucco/Lath
  • Sub-Rough Electrical (Underground)
  • Sub-Rough Plumbing (Underground)
  • Sub-Rough Mechanical (Underground)
  • Temporary Power